General Conditions (Job Overhead)
Flip cardIndirect costs incurred to manage and administer a construction project that cannot be directly assigned to a specific work item or material.
- Includes items like project management, supervision, temporary facilities, permits, and insurance.
- Essential for project execution but not part of the physical construction.
- Estimated as a separate line item or percentage within a bid.
Memory trick: Costs are like building blocks: some are structural, some are for the scaffolding and tools.
Pro Forma Financials
Flip cardProjected financial statements (income statement, balance sheet, cash flow statement) prepared in advance to forecast the financial performance of a future project or venture.
- Essential for securing financing and making investment decisions.
- Based on assumptions about future revenues, costs, and market conditions.
- Used for budgeting, strategic planning, and risk assessment.
Memory trick: Pro Forma: 'For the future,' not the past.
Wet Chemical Fire Suppression
Flip cardA fire suppression system primarily used in commercial kitchens to combat Class K (grease) fires. It applies a liquid agent that reacts with hot oils and fats to create a non-combustible foam layer.
- Effective for Class K fires (cooking oils/fats).
- Works by saponification and cooling.
- Less corrosive and easier to clean up than dry chemical agents, reducing equipment damage.
Memory trick: Kitchen fires need a 'Wet' solution, not just 'Dry' or 'Watery' wishes.
LEED Certification
Flip cardLeadership in Energy and Environmental Design (LEED) is a widely used green building rating system that recognizes projects for environmental performance.
- Developed by the U.S. Green Building Council (USGBC).
- Certifies buildings based on a points system across various categories.
- Requires careful planning and documentation from project inception.
Memory trick: To build green, you need a green team from the start.
Punch List
Flip cardA list of minor items that need to be completed or corrected by the contractor after substantial completion but before final payment.
- Generated during a final walk-through with the owner/architect.
- Addresses cosmetic defects, incomplete installations, or minor adjustments.
- Completion of the punch list is a prerequisite for final payment.
Memory trick: Punch it out, then close it out.
Roofing System Fire Ratings
Flip cardRoofing systems are assigned fire resistance ratings (Class A, B, C) based on their ability to resist exterior fire exposure, as determined by ASTM E108 testing.
- Class A is the highest fire resistance rating.
- Ratings depend on the entire roof assembly, not just the membrane.
- Common tests include flame spread, burning brand, and intermittent flame.
Memory trick: Fire Safety Rules: Always Build Right for A-Class Protection.
ASME A17.1/CSA B44
Flip cardThe Safety Code for Elevators and Escalators, establishing minimum safety requirements for the design, construction, installation, operation, inspection, testing, maintenance, alteration, and repair of elevators, escalators, and related conveying equipment.
- Jointly developed by ASME and CSA.
- Adopted by most jurisdictions in the U.S. and Canada.
- Covers passenger and freight elevators, escalators, moving walks, and dumbwaiters.
Memory trick: Elevators Always Seek Maximum (ASME) Safety.
Dampproofing Function
Flip cardThe application of a material to a foundation wall to resist the absorption and capillary action of incidental moisture from the soil, preventing dampness within the structure.
- Resists non-hydrostatic moisture
- Commonly asphalt-based coatings
- Less robust than waterproofing
- Prevents soil moisture from wicking into concrete/masonry
Memory trick: Dampproofing: 'Damp' means 'Diffuse' moisture, not full 'Drowning'.
PVC Roofing Membrane
Flip cardPolyvinyl Chloride (PVC) is a single-ply thermoplastic roofing membrane known for its strength, flexibility, chemical resistance, and heat-welded seams.
- Excellent UV and chemical resistance.
- Heat-welded seams create a monolithic, watertight bond.
- Often white, contributing to cool roof properties and energy efficiency.
Memory trick: Select the Perfect Roof: Climate, Durability, Seams, and Efficiency.
Vapor Barrier Purpose
Flip cardA material or system designed to impede the passage of water vapor, typically installed on the warm side of an insulation layer to prevent condensation within the building envelope.
- Prevents moisture migration into insulation
- Protects R-value of insulation
- Prevents mold and degradation of building materials
- Placement is critical (warm side of insulation)
Memory trick: A 'Vapor Barrier' is like a 'Vapor Blocker' for your insulation.
Differing Site Conditions Clause
Flip cardA contract provision that allows for an equitable adjustment in contract price or time if unforeseen physical conditions are encountered at the site.
- Applies to conditions materially different from those indicated in contract documents.
- Requires prompt written notification by the contractor.
- Prevents contractors from including large contingencies for unknown conditions.
Memory trick: When the site differs, stop, document, and report it fast!
Revolving Door Safety
Flip cardSafety features integrated into automatic revolving doors to prevent pedestrian injury, particularly entrapment, and ensure safe operation.
- Mandated by building codes and ANSI/BHMA standards.
- Includes sensors to detect presence and prevent crushing.
- Emergency stop buttons allow immediate manual halt of operation.
Memory trick: Automatic doors must 'Sense' you and have a 'Stop' button.
Indemnification Clause
Flip cardA contractual provision where one party (the indemnitor) agrees to compensate the other party (the indemnitee) for certain losses or damages.
- Transfers risk and liability.
- Can be broad or narrow in scope.
- Often heavily negotiated in construction contracts.
Memory trick: Indemnify means 'I'll take the fall for you, sometimes.'
EPDM Primer Function
Flip cardA liquid applied to a substrate before EPDM adhesive to clean, condition, and chemically prepare the surface, significantly improving the adhesion and bond strength of the EPDM membrane.
- Enhances adhesive bond strength
- Prepares porous or dusty surfaces
- Ensures long-term membrane adhesion
- Specific primer types for different substrates
Memory trick: Primer is the 'P' for 'Perfect Preparation' before EPDM adhesion.
Critical Path
Flip cardThe sequence of project activities that determines the shortest possible duration to complete the project, with no float (or slack) time.
- Any delay to a critical path activity will delay the entire project.
- Identified through Critical Path Method (CPM) scheduling.
- Requires careful monitoring and management to keep projects on schedule.
Memory trick: If the main road is blocked, your arrival is delayed by exactly that block.
Roof Deck Deterioration Protocol
Flip cardUpon discovery of unforeseen structural deterioration of a roof deck during renovation, the contractor must halt work in affected areas, document findings, notify the owner, and await instructions/approval for repair or replacement before proceeding.
- Unforeseen condition requiring immediate attention
- Impacts structural integrity and new roof performance
- Requires owner notification and approval for extra work
- Repair/replacement must occur before new roofing installation
Memory trick: For unexpected 'Damage', 'Document, Discuss, Decide' with the owner.
Licensed Professional Engineer (PE)
Flip cardA professional with a state license signifying competence to practice engineering, often required to design and stamp structural, mechanical, electrical, and plumbing systems.
- Responsible for public health, safety, and welfare in design.
- Their stamp signifies approval and responsibility for design documents.
- Required by building codes for complex structural and system designs.
Memory trick: For structure, trust the PE; they're the 'Pro' Engineer.
Counterflashing
Flip cardA secondary layer of flashing, typically metal, installed above and overlapping the primary base flashing at a roof-to-wall or roof penetration junction, to protect the top edge of the base flashing from water intrusion.
- Protects base flashing at vertical surfaces
- Often installed into a reglet or surface-mounted
- Creates a 'shingle' effect with base flashing
- Crucial for watertight roof-to-wall transitions
Memory trick: Counterflashing 'Covers' the 'Critical' joint where roof meets wall.
Risk Mitigation
Flip cardActions taken to reduce the probability of a risk occurring or to lessen the severity of its impact if it does occur.
- Proactive measures to minimize negative outcomes.
- Distinct from risk avoidance, transfer, or acceptance.
- Examples include backup plans, quality control, preventative maintenance.
Memory trick: Mitigate risks by making them smaller or less likely.
Current Ratio
Flip cardA liquidity ratio that measures a company's ability to pay short-term obligations or those due within one year.
- Calculated as Current Assets / Current Liabilities.
- Indicates short-term financial health.
- A ratio of 2:1 or higher is generally considered healthy.
Memory trick: Ratios reveal a company's financial story.
Quality Control (QC)
Flip cardA set of activities or techniques used to ensure that products, services, or processes meet specific quality standards and requirements by inspecting and testing the actual output.
- Focuses on identifying and correcting defects in the work itself.
- Involves inspections, testing, measurements, and verification.
- Performed by the contractor or their representatives during construction.
Memory trick: Quality Assurance plans the system, Quality Control checks the work.
OSHA Asbestos PEL
Flip cardThe maximum concentration of airborne asbestos fibers that workers can be exposed to over an 8-hour workday, as established by the Occupational Safety and Health Administration (OSHA).
- Current 8-hour Time-Weighted Average (TWA) PEL is 0.1 f/cc.
- Also has an Excursion Limit (EL) of 1.0 f/cc over a 30-minute period.
- Requires employers to implement protective measures to stay below these limits.
Memory trick: One tiny fiber per ten cubic centimeters is the limit for eight hours.
Request for Information (RFI)
Flip cardA formal written process used in construction to seek clarification on drawings, specifications, or other contract documents from the owner or design team.
- Used during pre-bid, construction, or post-construction phases.
- Ensures all parties have a clear understanding of project requirements.
- Helps prevent misinterpretations, errors, and costly changes later.
Memory trick: When facing a puzzle, always ask for the missing piece before you start building.
Fluid-Applied Air Barrier Thickness
Flip cardThe critical dimension of a fluid-applied air barrier membrane, which must meet manufacturer specifications for wet and/or dry film thickness to ensure continuous, effective air and moisture resistance.
- Ensures complete coverage and impermeability
- Prevents pinholes and weak spots
- Measured with a wet film gauge during application
- Directly impacts barrier performance and durability
Memory trick: For 'Fluid-Applied', 'Thickness' is the 'Ticket' to a tight seal.
Builder's Risk Insurance
Flip cardA specialized form of property insurance that covers buildings and materials under construction from various perils.
- Covers damage to the structure itself.
- Protects against perils like fire, theft, vandalism, and natural disasters.
- Typically purchased by the owner or general contractor.
Memory trick: Building's shield against construction's fiery foes.
Liquidated Damages Clause
Flip cardA contract provision that specifies a predetermined sum of money that one party will pay the other as compensation for a specific breach of contract (e.g., late completion).
- Must be a reasonable estimate of actual damages, not a punishment.
- Aims to avoid difficult calculation of actual damages in court.
- Common in construction contracts for project delays.
Memory trick: Liquidated damages: a 'liquid' sum for 'late' harm.
ISO Cleanroom Classification
Flip cardA standard (ISO 14644-1) that classifies cleanrooms based on the concentration of airborne particles per cubic meter at specified particle sizes. Lower ISO classes indicate fewer particles and higher cleanliness.
- ISO Class 7 allows up to 352,000 particles/m³ at 0.5 µm.
- Achieved primarily through high air changes per hour and HEPA/ULPA filtration.
- Positive pressure prevents unfiltered air ingress.
Memory trick: Cleanrooms need 'High Air' and 'HEPA' filters to 'Class' up.
Subcontractor Prequalification (Financial)
Flip cardThe process of evaluating a subcontractor's financial stability and capacity to successfully perform the work and meet contractual obligations.
- Crucial for risk management in construction.
- Involves reviewing financial statements, credit ratings, and bonding capacity.
- Ensures the subcontractor can fund their operations and handle project demands.
Memory trick: To know if their wallet is deep enough, ask to see their balance sheet.
Payment Terms (2/10 net 30)
Flip cardA common payment term offering a cash discount if the invoice is paid within a specified early period, otherwise the full amount is due by a later date.
- 2: The percentage of the discount offered.
- 10: The number of days within which the invoice must be paid to receive the discount.
- net 30: The full (net) amount is due within 30 days if the discount is not taken.
Memory trick: Two percent off if you pay in ten days, otherwise full amount in thirty.
Silicone Sealant Properties
Flip cardA high-performance sealant known for its excellent elasticity, UV stability, broad temperature range performance, and adhesion to diverse substrates, making it suitable for dynamic exterior joints.
- High movement capability (±25% to ±50%)
- Excellent UV resistance
- Wide service temperature range
- Good adhesion to glass, metal, masonry, and plastics
Memory trick: For 'Strong, Flexible, UV-Proof' exterior joints, 'Silicone' is the 'Superior' choice.
Plastic Shrinkage Cracking Prevention
Flip cardPlastic shrinkage cracks occur when the rate of evaporation of surface moisture exceeds the rate at which bleed water rises to the surface, causing the concrete surface to shrink.
- Common in hot, windy, or low-humidity conditions.
- Occurs before concrete sets.
- Prevented by reducing surface evaporation.
Memory trick: Don't let the sun bake your slab; cover it fast, or cracks you'll grab!
Reinforcement Bar Spacing (Slabs)
Flip cardThe clear distance between parallel reinforcing bars in concrete slabs, governed by ACI 318 to ensure proper concrete consolidation and bond.
- Minimum clear spacing: bar diameter, 1 inch, or 1.33x aggregate size.
- Maximum clear spacing (slabs): 18 inches or 3x slab thickness, whichever is smaller.
- Ensures concrete flow around bars and prevents segregation.
Memory trick: Space out your steel, or the concrete won't feel right, and the slab won't be tight.