NASCLA Accredited Commercial General Contractor flashcards
212 free flashcards. Tap a card to flip it.
Slump Test Purpose
Flip cardA test performed on fresh concrete to determine its consistency and workability.
- Measures the vertical drop of a molded concrete cone.
- Higher slump indicates higher workability (within limits).
- Used for quality control on site.
Memory trick: Slump for flow, Air for freeze, Unit for weight, Temp for set.
Tuckpointing Joint Preparation
Flip cardThe essential steps taken after removing old mortar and before applying new mortar during tuckpointing, focused on optimizing the brick-mortar interface for bonding and curing.
- Remove all loose debris.
- Clean joint surfaces.
- Thoroughly pre-wet joints and surrounding brick.
- Ensures proper mortar hydration and bond.
Memory trick: Clean, Wet, Pack, Tool, Cure: The repointing mantra.
Architectural Concrete Formwork
Flip cardFormwork specifically designed to produce a desired aesthetic finish on exposed concrete surfaces.
- Requires high-quality facing materials.
- Minimizes surface defects.
- Often uses HDO plywood or steel forms.
Memory trick: Lumber rough, Plywood smooth, HDO perfect, Steel durable.
Concrete Drop Height
Flip cardThe maximum vertical distance concrete can fall freely during placement without significant segregation.
- Critical for maintaining concrete homogeneity.
- Generally limited to 5 feet (1.5 meters) by ACI.
- Excessive drop causes aggregates to separate from paste.
Memory trick: Drop with care, Vibrate right, Lift slowly, Segregation fight.
Weep Holes
Flip cardSmall openings left in the mortar joints of the lowest course of a masonry wall (especially veneer) to allow accumulated moisture to drain from the wall cavity.
- Crucial for moisture management.
- Typically located above flashing.
- Prevents efflorescence, mold, rot.
- Required in cavity walls and veneer.
Memory trick: Weep holes let walls 'cry out' their moisture.
Post-Tensioning Strength Requirement
Flip cardThe minimum compressive strength concrete must achieve before tendons can be stressed in a post-tensioned system.
- Typically specified in design documents.
- Verified by cylinder breaks or non-destructive testing.
- Prevents concrete damage during stressing.
Memory trick: Tendons Laid, Concrete Poured, Strength Checked, Tension Applied.
Water-Cementitious Materials Ratio (w/cm)
Flip cardThe ratio of the mass of water to the mass of cementitious materials (cement + supplementary cementitious materials) in a concrete mix.
- Crucial factor in concrete strength and durability.
- Lower w/cm generally means higher strength and lower permeability.
- Must be carefully controlled during mixing.
Memory trick: Water on top, cement below, ratio's the key, watch it grow.
Internal Concrete Vibrator
Flip cardA type of vibrator consisting of a vibrating head inserted directly into fresh concrete to consolidate it.
- Most common type for structural concrete.
- Removes entrapped air and ensures dense concrete.
- Requires systematic insertion and withdrawal.
Memory trick: Internal deep, External thin, Surface wide, Hand for small.
Rubble Masonry
Flip cardA type of stone masonry that uses irregular, rough, or natural-shaped stones, often laid without continuous horizontal courses, contrasting with finely dressed ashlar masonry.
- Stones are unshaped or roughly shaped.
- Joints are often irregular.
- Can be 'random rubble' (no courses) or 'coursed rubble' (roughly leveled courses).
- Economical due to minimal stone dressing.
Memory trick: Ashlar is 'A'rtful, Rubble is 'R'aw.
Formwork Deflection
Flip cardThe temporary deformation or bending of formwork components under the weight and pressure of fresh concrete before it hardens.
- Must be limited to maintain dimensional accuracy.
- Affects aesthetics and structural alignment.
- Calculated based on material properties and load.
Memory trick: Deflection kept low, so the structure won't show a bow.
Concrete Finishing Sequence
Flip cardThe ordered series of operations performed on fresh concrete to achieve a desired surface texture, flatness, and durability.
- Timing is crucial for each step.
- Starts after concrete placement, ends with curing.
- Varies based on desired final finish.
Memory trick: Screed, Float, Wait, Float, Trowel, Cure.
Saturated Surface Dry (SSD)
Flip cardA condition of aggregate or concrete substrate where the pores are filled with water, but no free water exists on the surface.
- Crucial for proper bonding of cementitious repair materials.
- Prevents substrate from absorbing water from fresh mix.
- Achieved by pre-wetting and then allowing surface water to evaporate.
Memory trick: Clean, sound, and just wet enough for a strong blend.
Slump Test
Flip cardA test performed on fresh concrete to measure its consistency and workability, indicating how fluid or stiff the mix is.
- Measures workability, not strength.
- Uses a truncated cone mold.
- Result is measured by how much the concrete 'slumps' after the cone is removed.
Memory trick: Fresh as a Daisy, Slump away lazy.
Liquid Membrane Curing
Flip cardA curing method involving the application of a liquid compound to the concrete surface to form a moisture-retaining film.
- Forms a physical barrier against evaporation.
- Commonly used when continuous water curing is impractical.
- Must be applied evenly and at the correct coverage rate.
Memory trick: Hydrate Hard, Seal Smart, Steam Strong, Water Wise.
Bull Floating
Flip cardA concrete finishing operation performed after screeding to level the surface, embed aggregate, and bring paste to the surface.
- Uses a long-handled float (bull float).
- Removes screed marks.
- Prepares surface for later finishing tools.
Memory trick: Screed to Level, Float to Smooth, Trowel to Harden, Broom to Grip.
Cold Weather Masonry Threshold
Flip cardThe minimum ambient air temperature at which special precautions must be taken for masonry construction to prevent damage and ensure proper mortar curing.
- Typically 40°F (4°C)
- Prevents freezing of mortar water
- Ensures proper strength development
Memory trick: Forty degrees is where the cold masonry story begins.
Post-Tensioning Stressing Force
Flip cardThe controlled tensile force applied to post-tensioning tendons after concrete has gained sufficient strength, inducing compressive stresses in the concrete.
- Applied using hydraulic jacks.
- Monitored by gauges and elongation measurements.
- Typically stressed to a percentage (e.g., 80%) of ultimate tensile strength.
Memory trick: Stress is strength x area, then take a percentage share.
ASTM C270 Mortar Types
Flip cardClassifications of masonry mortar based on compressive strength and composition, denoted as M, S, N, O, and K (though K is rarely used).
- M: Highest strength, severe exposure, structural.
- S: High strength, at/below grade, lateral loads.
- N: Medium strength, general purpose, above grade.
- O: Low strength, interior, non-load-bearing.
Memory trick: My Strong Nasty Old Kook: M, S, N, O, K for strength.
Expansion Joints in Brick Masonry
Flip cardExpansion joints are continuous, unobstructed vertical joints that extend through the entire thickness of a brick veneer or wall, designed to accommodate horizontal expansion and contraction of masonry units.
- Crucial for brick veneer due to thermal and moisture expansion.
- Prevents cracking and stress buildup.
- Typically filled with a compressible sealant material.
Memory trick: Expand to avoid the Cracks, Control to prevent the Shrinks.
Concrete Repair Substrate Prep
Flip cardThe process of preparing existing concrete surfaces to receive repair materials for optimal bonding.
- Removes deteriorated concrete and contaminants.
- Achieves a rough, sound surface.
- Often requires saturated surface dry (SSD) condition.
Memory trick: Diagnose, Remove, Prepare, Apply, Cure, Protect.
Silica Dust Hazard
Flip cardThe risk of inhaling respirable crystalline silica (RCS) particles generated from cutting or grinding masonry materials, which can lead to incurable lung diseases like silicosis.
- Generated when cutting concrete, brick, stone.
- Causes silicosis, lung cancer, COPD.
- Requires engineering controls (ventilation, wet cutting).
- Requires administrative controls (work practices).
Memory trick: Dust is a silent killer; ventilate, wet, wear a mask.
Initial Rate of Absorption (IRA)
Flip cardThe rate at which a brick absorbs water from mortar, measured in grams per 30 square inches per minute. Crucial for proper mortar bond.
- Also known as suction rate.
- Too high IRA leads to dry, weak mortar.
- Too low IRA can cause bricks to float.
- Controlled by pre-wetting.
Memory trick: IRA is the critical 'thirst' of the brick for a strong mortar bond.
Grout in Reinforced Masonry
Flip cardGrout is a cementitious mixture used to fill the cores of hollow masonry units and the spaces between masonry and reinforcement, bonding the components together to form a composite structural element.
- Bonds reinforcement to masonry units.
- Increases compressive strength of the wall.
- Ensures composite action of the reinforced masonry.
Memory trick: Grout Gives Great Grip to Reinforcement
Silica Dust Control
Flip cardSilica dust is fine crystalline silica particles generated during activities like cutting, grinding, or drilling concrete, brick, or stone, which can cause silicosis when inhaled.
- Wet cutting is a primary engineering control to suppress dust.
- Ventilation is crucial for removing airborne particles.
- Respirators are a secondary personal protective equipment (PPE) control.
Memory trick: Wet Works Wonders, Ventilate Vigorously, Wear When Necessary.
Historic Mortar Repointing
Flip cardThe process of removing deteriorated mortar joints and replacing them with new mortar, typically using a softer, more permeable mortar (like Type O) to protect historic brick units.
- New mortar must be softer than original brick.
- Type O mortar is often preferred.
- Allows moisture to escape through joints.
- Prevents damage to historic brick.
Memory trick: Old structures need 'O'ld-school soft mortar.
Vapor Barrier (Slab)
Flip cardA material, typically a plastic sheet, placed under a concrete slab on grade to impede the movement of moisture vapor from the ground into the building.
- Protects interior finishes and contents from moisture.
- Reduces humidity within the building.
- Must be durable and properly sealed.
Memory trick: Barrier for vapor, keeps the floor drier.
Efflorescence Mitigation
Flip cardEfflorescence is a crystalline deposit of salts that appears on masonry surfaces, typically white, caused by water dissolving soluble salts within the masonry and transporting them to the surface where the water evaporates.
- Requires three conditions: soluble salts, moisture, and a pathway for moisture.
- Long-term mitigation focuses on eliminating moisture ingress.
- Surface cleaning is temporary if the source is not addressed.
Memory trick: Find the Flow, Fix the Flaw, Forget the Frosting.
Internal Concrete Vibration
Flip cardThe process of consolidating fresh concrete using a vibrating probe inserted directly into the concrete mix to remove entrapped air and achieve maximum density.
- Removes entrapped air voids.
- Improves density, strength, and durability.
- Spacing of insertions is critical for effective consolidation.
Memory trick: Vibrator's reach, consolidate each patch.
Concrete Cover for Rebar
Flip cardThe distance between the surface of the reinforcing steel and the nearest concrete surface.
- Protects rebar from corrosion.
- Ensures fire resistance.
- Crucial for proper bond development.
Memory trick: Cover right, Spacing true, Clean rebar, Secure too.
Concrete Cover
Flip cardThe minimum distance between the surface of the reinforcing steel and the exterior surface of the concrete.
- Protects rebar from corrosion.
- Provides fire resistance.
- Ensures structural integrity and durability.
Memory trick: Cover the steel, fight the rust and feel the heat.
Vapor Barrier Protection
Flip cardMeasures taken to prevent damage to a vapor barrier during construction activities.
- Essential for maintaining barrier integrity.
- Typically involves a protective layer.
- Prevents moisture migration into the slab.
Memory trick: Subgrade Smooth, Barrier Safe, Rebar Ready, Pour Perfect.
Horizontal Joint Reinforcement
Flip cardSteel wires embedded in mortar joints of masonry walls, typically ladder or truss type, to improve flexural strength and control cracking.
- Resists bending forces (flexural stresses).
- Distributes shrinkage stresses.
- Helps control thermal expansion/contraction.
- Placed at specified vertical intervals.
Memory trick: Horizontal wires are the 'belt' for bending and cracks.
Cold Weather Concreting
Flip cardPractices and procedures used when placing, finishing, and curing concrete at ambient temperatures below 40°F (4°C) to prevent damage from freezing.
- Prevent freezing before strength gain.
- Use accelerators or Type III cement.
- Protect and insulate concrete after placement.
Memory trick: Winter concrete needs heat and speed.
Retainage
Flip cardA portion of the agreed-upon contract price that is deliberately withheld until the work is completed to the satisfaction of the owner.
- Typically 5-10% of progress payments.
- Protects the owner against incomplete or defective work.
- Released upon substantial completion or final acceptance.
Memory trick: Money held back until the job is truly done.
PVC Roofing Membrane
Flip cardPolyvinyl Chloride (PVC) is a single-ply thermoplastic roofing membrane known for its strength, flexibility, chemical resistance, and heat-welded seams.
- Excellent UV and chemical resistance.
- Heat-welded seams create a monolithic, watertight bond.
- Often white, contributing to cool roof properties and energy efficiency.
Memory trick: Select the Perfect Roof: Climate, Durability, Seams, and Efficiency.
Vapor Barrier Purpose
Flip cardA material or system designed to impede the passage of water vapor, typically installed on the warm side of an insulation layer to prevent condensation within the building envelope.
- Prevents moisture migration into insulation
- Protects R-value of insulation
- Prevents mold and degradation of building materials
- Placement is critical (warm side of insulation)
Memory trick: A 'Vapor Barrier' is like a 'Vapor Blocker' for your insulation.
Differing Site Conditions Clause
Flip cardA contract provision that allows for an equitable adjustment in contract price or time if unforeseen physical conditions are encountered at the site.
- Applies to conditions materially different from those indicated in contract documents.
- Requires prompt written notification by the contractor.
- Prevents contractors from including large contingencies for unknown conditions.
Memory trick: When the site differs, stop, document, and report it fast!
Revolving Door Safety
Flip cardSafety features integrated into automatic revolving doors to prevent pedestrian injury, particularly entrapment, and ensure safe operation.
- Mandated by building codes and ANSI/BHMA standards.
- Includes sensors to detect presence and prevent crushing.
- Emergency stop buttons allow immediate manual halt of operation.
Memory trick: Automatic doors must 'Sense' you and have a 'Stop' button.
Indemnification Clause
Flip cardA contractual provision where one party (the indemnitor) agrees to compensate the other party (the indemnitee) for certain losses or damages.
- Transfers risk and liability.
- Can be broad or narrow in scope.
- Often heavily negotiated in construction contracts.
Memory trick: Indemnify means 'I'll take the fall for you, sometimes.'
EPDM Primer Function
Flip cardA liquid applied to a substrate before EPDM adhesive to clean, condition, and chemically prepare the surface, significantly improving the adhesion and bond strength of the EPDM membrane.
- Enhances adhesive bond strength
- Prepares porous or dusty surfaces
- Ensures long-term membrane adhesion
- Specific primer types for different substrates
Memory trick: Primer is the 'P' for 'Perfect Preparation' before EPDM adhesion.
Critical Path
Flip cardThe sequence of project activities that determines the shortest possible duration to complete the project, with no float (or slack) time.
- Any delay to a critical path activity will delay the entire project.
- Identified through Critical Path Method (CPM) scheduling.
- Requires careful monitoring and management to keep projects on schedule.
Memory trick: If the main road is blocked, your arrival is delayed by exactly that block.
Primer Application Conditions
Flip cardOptimal application of roofing primers depends heavily on ambient environmental conditions, especially temperature and humidity, to ensure proper curing and substrate adhesion.
- Manufacturer specifications for temperature and humidity must be followed.
- Improper conditions can lead to poor adhesion and system failure.
- Substrate moisture content is also critical.
Memory trick: Primer Success: Temperature Right, Humidity Low, Surface Dry, Manufacturer's Way.
Licensed Professional Engineer (PE)
Flip cardA professional with a state license signifying competence to practice engineering, often required to design and stamp structural, mechanical, electrical, and plumbing systems.
- Responsible for public health, safety, and welfare in design.
- Their stamp signifies approval and responsibility for design documents.
- Required by building codes for complex structural and system designs.
Memory trick: For structure, trust the PE; they're the 'Pro' Engineer.
Counterflashing
Flip cardA secondary layer of flashing, typically metal, installed above and overlapping the primary base flashing at a roof-to-wall or roof penetration junction, to protect the top edge of the base flashing from water intrusion.
- Protects base flashing at vertical surfaces
- Often installed into a reglet or surface-mounted
- Creates a 'shingle' effect with base flashing
- Crucial for watertight roof-to-wall transitions
Memory trick: Counterflashing 'Covers' the 'Critical' joint where roof meets wall.
Risk Mitigation
Flip cardActions taken to reduce the probability of a risk occurring or to lessen the severity of its impact if it does occur.
- Proactive measures to minimize negative outcomes.
- Distinct from risk avoidance, transfer, or acceptance.
- Examples include backup plans, quality control, preventative maintenance.
Memory trick: Mitigate risks by making them smaller or less likely.
Current Ratio
Flip cardA liquidity ratio that measures a company's ability to pay short-term obligations or those due within one year.
- Calculated as Current Assets / Current Liabilities.
- Indicates short-term financial health.
- A ratio of 2:1 or higher is generally considered healthy.
Memory trick: Ratios reveal a company's financial story.
HVAC Static Pressure
Flip cardThe resistance to airflow in a ductwork system, measured in inches of water gauge (in. w.g.). High static pressure can significantly reduce the actual airflow (CFM) delivered by a fan.
- Caused by friction from duct walls, elbows, filters, and dampers.
- Fans have performance curves showing CFM vs. static pressure.
- Excessive static pressure leads to reduced airflow and increased energy consumption.
Memory trick: Low airflow? 'Static' pressure is 'Sticking' it up!
Performance Bond
Flip cardA surety bond issued by an insurance company or bank to a contractor to guarantee satisfactory completion of a project by the contractor.
- Protects the project owner against contractor default.
- Ensures the work is completed according to contract terms.
- Typically required for public works projects and large private projects.
Memory trick: A performance bond guarantees the show will go on as planned.
Building System Commissioning
Flip cardA quality assurance process that verifies and documents that all building systems and assemblies are planned, designed, installed, tested, operated, and maintained to meet the owner's project requirements.
- Applies to HVAC, electrical, plumbing, fire safety, and other critical systems.
- Typically involves a third-party commissioning agent.
- Ensures optimal performance, energy efficiency, and occupant comfort.
Memory trick: Commissioning makes sure the building's heart and brain work as planned.
Dampproofing vs. Waterproofing
Flip cardDampproofing resists capillary moisture movement, while waterproofing resists liquid water under hydrostatic pressure.
- Dampproofing is for less severe moisture conditions.
- Waterproofing forms a complete barrier against water.
- Choice depends on water table, soil conditions, and building use.
Memory trick: Below Ground: Damp for Capillary, Water for Pressure.
Tapered Roof Insulation
Flip cardRigid insulation boards cut at varying thicknesses to create slopes on a flat roof deck, ensuring positive drainage and preventing ponding water.
- Creates positive roof drainage
- Prevents ponding water
- Extends roof membrane lifespan
- Typically specified in 'inches per foot' slope
Memory trick: Tapered insulation is like a 'Tilting Platform' for water.
Primer Coverage Rate
Flip cardPrimer coverage rate refers to the area (typically in square feet) that a specific volume of primer (e.g., a gallon or bucket) can effectively cover on a given substrate.
- Coverage varies by primer type, substrate porosity, and application method.
- Essential for accurate material ordering and project budgeting.
- Always refer to manufacturer's specifications for precise rates.
Memory trick: Quantity: Total Area Divided by Rate, Always Estimate Up.
Hoistway Fall Protection
Flip cardMeasures taken to prevent personnel or objects from falling into elevator or escalator hoistways/shafts during construction or maintenance activities.
- Open hoistways are major fall hazards.
- Physical barriers are the primary protection method.
- OSHA mandates guarding of floor openings.
Memory trick: Open shafts need 'Barricades' first, then 'Briefings' and 'Belts'.
Trash Chute Fire Safety
Flip cardDesign and construction features for trash chute systems that ensure they do not become a conduit for fire and smoke spread between different floors of a building.
- Mandated by building codes (e.g., IBC).
- Includes fire-rated doors and often sprinkler systems.
- Aims to maintain compartmentalization and prevent vertical fire spread.
Memory trick: Chutes need 'Fire Doors' to 'Seal' the deal on safety.
Operation & Maintenance (O&M) Manuals
Flip cardComprehensive documents provided at project close-out that detail the proper operation, maintenance, and troubleshooting procedures for all installed equipment and systems in a facility.
- Essential for facility managers and building occupants.
- Includes equipment specifications, warranty information, spare parts lists, and safety precautions.
- Ensures longevity, efficiency, and compliance of building systems.
Memory trick: For the building to keep running, give them the 'how-to' book.
Entrapped Roof Moisture Remediation
Flip cardEntrapped moisture in roof assemblies requires identifying the source, removing saturated materials, and repairing the roof system to prevent recurrence.
- Moisture compromises insulation's thermal performance.
- Leads to deck deterioration and potential structural issues.
- Requires invasive repair for effective long-term solution.
Memory trick: Moisture's Out: Find, Remove, Repair, Restore.
Modular Wall System Components
Flip cardFactory-fabricated wall sections designed for quick installation and reconfiguration, often incorporating specialized elements for acoustics, fire resistance, and utility integration.
- Offer flexibility and speed of installation.
- Can include integrated elements like doors, windows, and utilities.
- Acoustic and fire ratings depend on internal components and materials.
Memory trick: Modular walls need 'Sound' advice and a 'Fire' defense.
NFPA 96 Hood Clearance
Flip cardThe National Fire Protection Association (NFPA) Standard 96 establishes minimum requirements for the design, installation, operation, inspection, and maintenance of equipment for the ventilation and fire protection of commercial cooking operations.
- Type I hoods are for grease-laden vapors.
- Minimum 18 inches (457 mm) clearance to cooking surface.
- Critical for fire safety and efficient capture of contaminants.
Memory trick: For Type I hoods, '18' is the 'Sweet' spot for safety.
Air Barrier Function
Flip cardAn air barrier is a system of materials designed and constructed to control air flow between a conditioned space and an unconditioned space, or the outdoors.
- Reduces energy consumption by preventing air leakage.
- Controls moisture movement by stopping air-transported vapor.
- Improves thermal performance of insulation by preventing air washing.
Memory trick: Air Barriers: Stop Leaks, Save Energy, Stay Dry.
OSHA Hierarchy of Controls
Flip cardA system used by OSHA to determine how to implement feasible and effective controls for hazards, prioritizing elimination and substitution.
- Ranks controls from most effective to least effective.
- Includes Elimination, Substitution, Engineering Controls, Administrative Controls, and PPE.
- Aims to remove the hazard at the source whenever possible.
Memory trick: Eliminate, Substitute, Engineer, Administer, Protect – ESCAPE!