FAA Part 107 Remote Pilot (UAG)OperationsEasy
Before launching a small UAS for a rooftop inspection job, a remote pilot in command performs the preflight assessment required by 14 CFR 107.49. Which of the following is one of the required elements of this assessment?
- AFiling a flight plan with the nearest Flight Service Station
- BConfirming that a manned aircraft pilot certificate is available at the control station
- CObtaining a NOTAM from the local air traffic control tower for every flight
- DAssessing the location of persons and property on the surface within the operating area
Show answer & explanationAnswer & explanation
Correct answer: D. Assessing the location of persons and property on the surface within the operating area
14 CFR 107.49 requires the remote PIC to assess the operating environment, including local weather, airspace and flight restrictions, and the location of persons and property on the surface, before every flight.
Why the other options are wrong
- A. Filing an FSS flight plan is not required for Part 107 operations.
- B. A manned pilot certificate is not part of the preflight assessment requirement.
- C. A NOTAM is not automatically issued or required for every routine sUAS flight.
Preflight Assessment (107.49)
The set of operating-environment and equipment checks a remote PIC must complete before every UAS flight under Part 107.
- Must assess local weather
- Must assess local airspace/flight restrictions
- Must assess persons/property on surface
- Must check control link and aircraft condition
Memory trick: WASP: Weather, Airspace, Surface hazards, People/property