CSLB C-39 Roofing ContractorLow-Slope RoofingHard

A roofing contractor is installing tapered insulation to create positive drainage on a low-slope BUR roof. The specified taper is 1/4 inch per foot, sloping from a roof drain at the low point to a high point 40 feet away. If the insulation thickness at the drain is 1.5 inches, what minimum insulation thickness is required at the high point?

  1. A13 inches
  2. B11.5 inches
  3. C10 inches
  4. D15.5 inches
Show answer & explanation

Correct answer: B. 11.5 inches

Total rise = 1/4 in/ft × 40 ft = 10 inches. Adding this to the starting thickness at the drain (1.5 in) gives 1.5 + 10 = 11.5 inches at the high point.

Why the other options are wrong

  • A. This overstates the rise by using a steeper slope than specified.
  • C. This is only the rise amount, forgetting to add the starting thickness at the drain.
  • D. This adds the rise twice, which does not match the given taper rate.

Tapered Insulation Slope Calculation

Tapered insulation boards are manufactured to create a designed slope toward drains by increasing thickness at a fixed rate per foot of horizontal run.

  • Rise = slope rate (in/ft) × horizontal distance (ft)
  • Final thickness = starting thickness + total rise
  • Common taper rates are 1/8, 1/4, and 1/2 inch per foot

Memory trick: Rise equals rate times run, then add the start.