CompTIA DataSys+ (DS0-001)Business ContinuityMedium

A database administrator is evaluating different disaster recovery strategies for a critical online transaction processing (OLTP) database. The business requires a Recovery Time Objective (RTO) of 4 hours and a Recovery Point Objective (RPO) of 1 hour. The solution must minimize operational overhead during normal operations. Which of the following disaster recovery strategies best meets these requirements?

  1. AWarm Standby
  2. BHot Standby
  3. CCold Standby
  4. DDaily Full Backups with Offsite Storage
Show answer & explanation

Correct answer: A. Warm Standby

Warm Standby offers a balance between recovery time and cost, making it suitable for an RTO of 4 hours and an RPO of 1 hour with minimal operational overhead during normal operations. It involves a fully functional but non-active database that can be quickly brought online.

Why the other options are wrong

  • B. Hot Standby (or Active-Active/Active-Passive with replication) would typically provide a much lower RTO and RPO, but with significantly higher cost and operational overhead than required.
  • C. Cold Standby typically has a much longer RTO than 4 hours, as it requires significant setup time after a disaster.
  • D. Daily Full Backups would result in an RPO of up to 24 hours (data loss since last backup) and a much longer RTO due to the time required to restore and apply logs.

Warm Standby

A disaster recovery strategy where a secondary database system is maintained in a near-ready state, often with frequent data synchronization from the primary.

  • Offers a balance between RTO/RPO and cost.
  • Secondary system is partially configured and updated regularly.
  • Requires some manual intervention or automation to become fully operational after failover.

Memory trick: Warm standby keeps your data ready, not too hot, not too cold, just right for recovery.

More Business Continuity questions