Praxis Core Academic Skills for Educators: Mathematics (5733)Algebra and FunctionsMedium

A production manager is tracking the output of two different machines. Machine A produces 50 units per hour, and Machine B produces 70 units per hour. If Machine A runs for 'x' hours and Machine B runs for 'y' hours, and their combined output is 460 units, which equation represents this situation?

  1. A120(x + y) = 460
  2. B50x + 70y = 460
  3. C70x + 50y = 460
  4. Dx + y = 460
Show answer & explanation

Correct answer: B. 50x + 70y = 460

The number of units produced by Machine A is its rate (50 units/hour) multiplied by the hours it runs (x), so 50x. Similarly, for Machine B, it's 70y. The combined output is the sum of their individual outputs, so 50x + 70y = 460.

Why the other options are wrong

  • A. Incorrect. This equation implies a combined rate of 120 applied to total hours, not individual rates.
  • C. Incorrect. This equation swaps the rates for Machine A and Machine B.
  • D. Incorrect. This equation would represent the total number of hours worked, not total units.

Translating Word Problems to Linear Equations

The process of converting a real-world scenario described in words into a mathematical linear equation or system of equations to solve for unknown quantities.

  • Identify unknown quantities and assign variables.
  • Look for keywords indicating operations (sum, product, difference, etc.).
  • Formulate equations based on the relationships described.

Memory trick: Read, Define, Translate, Check – like turning a story into math code!

More Algebra and Functions questions