CSLB C-46 Solar ContractorPlanning and EstimatingEasy

A C-46 contractor is conducting a final inspection of a newly installed residential PV system before calling for the rough-in electrical inspection. Which of the following is the MOST critical item to verify regarding grounding and bonding for system safety?

  1. AConduit fill ratios comply with NEC 310.15(B)(3)(a).
  2. BThe inverter chassis is painted to match the exterior wall color.
  3. CThe PV array is oriented precisely to true south.
  4. DAll module frames are connected to the equipment grounding conductor.
Show answer & explanation

Correct answer: D. All module frames are connected to the equipment grounding conductor.

Proper grounding and bonding of all metallic, non-current-carrying components (like module frames and racking) is paramount for safety. It ensures that in the event of a fault, hazardous voltages are safely dissipated to the earth, preventing shock hazards and equipment damage. This is a fundamental requirement of NEC Article 690.

Why the other options are wrong

  • A. Conduit fill ratios are important for preventing overheating and ensuring proper wire sizing, but grounding of module frames is a more fundamental safety aspect for the entire array.
  • B. Inverter aesthetics (painting) are not a safety or critical inspection item.
  • C. Array orientation affects performance, not direct electrical safety during a rough-in inspection.

PV System Grounding & Bonding

Connecting all non-current-carrying metallic components of a PV system to the earth to provide a safe path for fault currents and prevent electrocution.

  • Mandated by NEC Article 690.
  • Protects against shock hazards and lightning strikes.
  • Ensures proper overcurrent protection device operation.

Memory trick: Ground your frames, or feel the pain! Safety first, come sun or rain!