A site superintendent is overseeing the final grading of a commercial parking lot. The design calls for a 2% slope for drainage. If the parking lot is 100 feet long in the direction of the slope, what is the total elevation change from one end to the other?

  1. A2 feet
  2. B2.5 feet
  3. C4 feet
  4. D1 foot
Show answer & explanation

Correct answer: A. 2 feet

A 2% slope means a 2-foot change in elevation for every 100 feet of horizontal distance. Therefore, for a 100-foot long parking lot with a 2% slope, the total elevation change is 2 feet. Calculation: (2/100) * 100 feet = 2 feet.

Why the other options are wrong

  • B. 2.5 feet would be a 2.5% slope over 100 feet.
  • C. 4 feet would be a 4% slope over 100 feet.
  • D. 1 foot would be a 1% slope over 100 feet.

Slope Calculation (Percentage)

Slope percentage is calculated as (vertical rise / horizontal run) * 100%. To find elevation change, rearrange to: vertical rise = (slope % / 100) * horizontal run.

  • Slope % = (Rise / Run) * 100%.
  • Used for grading and drainage.
  • Ensures proper water runoff.

Memory trick: Slope percent is rise over run, times one hundred, when the grading is done.