CSLB C-27 Landscaping ContractorSite Preparation and DrainageMedium

A C-27 contractor is preparing a site for a new gravel pathway that will experience moderate foot traffic. To ensure stability and prevent settling, what is the minimum relative compaction percentage generally required for the subgrade beneath a gravel pathway?

  1. A95% relative compaction
  2. B100% relative compaction
  3. C90% relative compaction
  4. D85% relative compaction
Show answer & explanation

Correct answer: C. 90% relative compaction

For gravel pathways experiencing moderate foot traffic, a minimum of 90% relative compaction for the subgrade is typically required. This provides sufficient stability to prevent settling and maintain the pathway's integrity over time.

Why the other options are wrong

  • A. 95% relative compaction is often specified for heavier load areas like driveways or building foundations.
  • B. 100% relative compaction is difficult to achieve and usually only required for very critical structures or pavement under heavy loads.
  • D. 85% relative compaction is generally too low for a pathway and could lead to significant settling.

Subgrade Compaction (Gravel Pathway)

The minimum relative compaction percentage required for the subgrade beneath a gravel pathway, typically 90%, to ensure stability and prevent future settling.

  • Prevents differential settling of the pathway.
  • Increases load-bearing capacity of the subgrade.
  • Ensures the longevity and evenness of the pathway surface.
  • Achieved through mechanical compaction with appropriate moisture content.

Memory trick: Ninety percent for paths, so they last.