EPA Section 608 Universal Certification ExamType II (High-Pressure Appliances)Medium

A technician is evacuating a high-pressure appliance containing R-407C after a major repair. The system capacity is 30 lbs. What is the MINIMUM required evacuation level for this system before recharging?

  1. A10 inches of Hg vacuum
  2. B25 inches of Hg vacuum
  3. C0 psig
  4. D500 microns of mercury
Show answer & explanation

Correct answer: D. 500 microns of mercury

For high-pressure appliances, specifically those with a system charge of less than 200 lbs, a major repair requires evacuation to 500 microns of mercury (0.5 mm Hg absolute). This ensures proper dehydration and removal of non-condensables.

Why the other options are wrong

  • A. 10 inches of Hg vacuum is far too low and indicates little to no actual vacuum.
  • B. 25 inches of Hg vacuum is an older, less stringent requirement and not deep enough for modern systems or major repairs.
  • C. 0 psig (atmospheric pressure) is insufficient for proper evacuation and dehydration.

High-Pressure Appliance Evacuation Levels (Major Repair)

The minimum vacuum levels required by EPA regulations for high-pressure appliances after a major repair, before recharging.

  • 500 microns is standard for most systems.
  • Ensures dehydration and removal of non-condensables.
  • Different levels apply for specific conditions (e.g., disposal).

Memory trick: To be truly clean, get down to the 'microns' in a major repair!